Category
China Supplier Hang Lever Type Rubber Sheet Cooling Machine / Rubber Batch off Cooler with CE&ISO
China Suppier Hang Lever Type Rubber Sheet Cooling Machine With CE&ISOAuto Swing Rubber Sheet Batch off Cooler Machine A
Basic Info.
Model NO. | XPGL-1000 |
Structure | Vertical |
Application | Rubber Sheet Cooling |
Type | Hang Lever Type |
Cooling Method | Electric with Fans |
Transport Package | Standard Export Package |
Specification | XPGL-800 |
Trademark | JUNFAN |
Origin | Made in China |
HS Code | 84778000 |
Production Capacity | 200sets/Year |
Product Description
China Suppier Hang Lever Type Rubber Sheet Cooling Machine With CE&ISOAuto Swing Rubber Sheet Batch off Cooler MachineAll our machines can be customized according to your requirements.
Application
Rubber batch-off machine is the downstream auxiliary to the mixer or the dispersion mixer. It is used for cooling, folding and depositing the rubber strip that comes from the open mills or twin screw extruder. It is designed to perform continuous operations of rubber slab conveying, separate applying, air cooling, drying, cutting and wig-wag stacking.
>> Features
1. There are two structures types: Overhead and floor-standing types.2. The clients can choose high or low disposition according to the practical requirements.3. The high disposition batch-off line has hydraulic auto wig wag section, which can battle the rubber strip tidily, the strip tidy ratio (< =100mm);4. There are three working positions for auto entering and outputting of material tray.5. Auto rubber collecting device; Auto cutter device; It has high automatization and can realize unattended operation.
>>MAIN TECHNICAL SPECIFICATION
Model | XPG-600 | XPG-800 | XPG-900 |
Max. rubber sheet width | 600mm | 800mm | 900mm |
The thickness of the rubber sheet | 4~10mm | 4~10mm | 6~12mm |
Linear speed of taking-in conveyor | 3~24m/min | 3~35m/min | 4~40m/min |
Linear speed of sheet hanging bar | 1-1.3m/min | 1-1.3m/min | 1-1.3m/min |
Hanging height of the sheet hanging bar | 1000-1500m | 1000-1500m | 1000-1500m |
Number of cooling fans | 12 | 20~32 | 32~34 |
Power | 16KW | 25~34KW | 250KW |
Overall Dimension(mm) | 14250X3300X3405 | 16800X3400X3520 | 6000X2850X4450 |
Description of spare part
1. Take in device:Used to take pressure in film, according to cylinder controlled by fluctuation, operation convenience. Taking in speed can be controlled by manual, it can be ascension. Take device adopts conveyor, the transmission system adopts frequency governor to control.2. Soak device:Equipped with triplet, manual rotary valve and pressure cylinder, adjust pressed roll according to cylinder control through the manual rotary valve, in order to Make discontinuous film compressed together and the film continuous a slice.3. Leaching plasma device:Function: Take over the film conveying equipment undertakes immersing, and carry on isolation agent. Equipped with cooling water pipe, through the cooling water source, continuous cooling liquid isolation, in order to control the temperature.4. Take up device:This device through the conveyor belt with isolation liquid film will be conveyed to the air cooling section gripping.5. Wind cooling device:Constitute: It is made of frame, cooling fans, hook rail and hang lever conveyor. Cooling fan selection adopts 20 axial fan, satisfy the requirements of film cooling; Hang lever are installed on the taper pin, film in hang lever.6. Conveying laminated device:Will the film into laminated measures, continuous fold in film seat.7. Air control part:Take-in control, each cylinder pressure and in the action, control system adopts reliable performance with high quality products.8. Electrical control system:(1) All the wires controlled by PLC, it easy for operation, reliable quality.(2) The speed of production line can be through the inverter adjustment, make the film cooling line speed and host match.(3) Fan control by the group control each motor are over-current protection circuit breaker, when a fault fan produced when the output signal of the fan, fault in all units and stop hair drier, just deal with a fault can be fan.
Multi-Layer Type Rubber Sheet Cooling Machine
Hang Lever Type Rubber Sheet Cooling Machine
Annular Type Batch-Off Cooler
>> Company Information
1. 40 years on rubber machinery manufacturing and exporting.2. Delivery within 30 days.3. Safety wood or plywood crates packaging.4. Full transportation insurance.5. Sell to 126 countries on 6 continents.
>> LAB MACHINESWe had a lot of cooperation with East China University of Technology State Key Laboratory of Chemical Engineering, Qingdao university,Beijing chemical industry research institute ect. and supply the lab rubber machines. >>MACHINE LISTOur company specially manufacturring rubber mixing mill, rubber vulcanizing press( frame type, four column type and lab press), rubber kneader and tire recycling line.>> AFTER SERVICES FOR THE PRESS1. The above machines are all passed inspection of 3~5 hours of full load operation before leaving the factory, you can use it directly thus saving the time of test-run and expense.2. Warranty: 12 months after installation, if our machines have any problems, you can feel free contact me, we will solve it as soon as possible, and give you the best services.
Delivery Demonstration
Some Exhibition Pictures
COMPANY CERTIFICATE
>>FAQ
1. Delivery time of the rubber machines?
This is specially designed machine according to your specific requirement.
From engineer designing to production completion, it needs about 25 to 35 days.
2. What does your factory do regarding quality control?
We pay much more importance to quality control from the very beginning to the end of production.
Every machine will be fully assembled and carefully tested before shipment.
3. What's the machine quality guarantee?
Quality guarantee time is one year.We choose world famous brand components to keep our machine in perfect working condition.
4. Are you able to give installation and commissioning overseas? How long time will it take?
Yes, we can supply overseas service and technical support but customer needs to pay for the cost of the installation.
Small machine usually takes within 2~3 days.
Big plant usually takes about 30 days.
5.How can I trust you to deliver the right machine as I ordered?
We will absolutely deliver a good quality machine as we discussed and confirmed in the order.
The core of our company culture is innovation,quality,integrity and efficiency. Also we have had many good cooperation with world famous rubber production manufacturers. If you come to our factory, we can show you're the user around us.
6.How can we go to your side?
We are located in Qingdao City, Shandong province, China. The name of airport is Qingdao liuting airport.
We will pick up you at the airport.